{"id":194,"date":"2016-02-02T16:22:13","date_gmt":"2016-02-02T21:22:13","guid":{"rendered":"http:\/\/blogs.butler.edu\/lightboard\/?p=194"},"modified":"2016-02-02T16:22:49","modified_gmt":"2016-02-02T21:22:49","slug":"final-steps-in-construction","status":"publish","type":"post","link":"https:\/\/blogs.butler.edu\/lightboard\/2016\/02\/02\/final-steps-in-construction\/","title":{"rendered":"Final Steps in Construction"},"content":{"rendered":"<p>The final pieces are starting to come together in the construction of the Lightboard Studio.\u00a0Today the final measurements were taken by the glass\u00a0production company. The estimated time for delivery of this final piece\u00a0is about two weeks. This is just in time for\u00a0our Open House! \u00a0Once the system is complete the next steps will be to document and train staff and students as well as develop a support structure. Things are moving quickly and it&#8217;s exciting to see things finally coming together!\u00a0\u00a0Here are a few pictures from today as we had a few visitors.<\/p>\n<p><a href=\"http:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3854.jpg\" rel=\"attachment wp-att-195\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-197\" src=\"http:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3859-225x300.jpg\" alt=\"IMG_3859\" width=\"225\" height=\"300\" srcset=\"https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3859-225x300.jpg 225w, https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3859-768x1024.jpg 768w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<a href=\"http:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3858.jpg\" rel=\"attachment wp-att-199\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-199\" src=\"http:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3858-300x225.jpg\" alt=\"IMG_3858\" width=\"300\" height=\"225\" srcset=\"https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3858-300x225.jpg 300w, https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3858-768x576.jpg 768w, https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3858-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><span style=\"color: #000000;\">LED lights mounted \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Confidence Monitor\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3854.jpg\" rel=\"attachment wp-att-195\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-195\" src=\"http:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3854-300x225.jpg\" alt=\"IMG_3854\" width=\"396\" height=\"297\" srcset=\"https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3854-300x225.jpg 300w, https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3854-768x576.jpg 768w, https:\/\/blogs.butler.edu\/lightboard\/files\/2016\/02\/IMG_3854-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 396px) 100vw, 396px\" \/><br \/>\n<\/a><span style=\"color: #000000;\">Wade Guisewhite (Manager Tier 2\/Information Technology)<\/span><br \/>\n<span style=\"color: #000000;\">and\u00a0Julie Miller (Dean of Libraries) visit the Lightboard Studio<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The final pieces are starting to come together in the construction of the Lightboard Studio.\u00a0Today the final measurements were taken by the glass\u00a0production company. The estimated time for delivery of this final piece\u00a0is about two weeks. This is just in&hellip;<\/p>\n","protected":false},"author":9197309,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31,306137,308735],"tags":[],"class_list":["post-194","post","type-post","status-publish","format-standard","hentry","category-construction","category-developing-lightboard","category-equipment"],"_links":{"self":[{"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/posts\/194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/users\/9197309"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/comments?post=194"}],"version-history":[{"count":2,"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/posts\/194\/revisions"}],"predecessor-version":[{"id":201,"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/posts\/194\/revisions\/201"}],"wp:attachment":[{"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/media?parent=194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/categories?post=194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.butler.edu\/lightboard\/wp-json\/wp\/v2\/tags?post=194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}